London Underground District Line and Circle Line ‘S’ Stock Enabling
ARK were contracted to undertake legacy signalling scheme design and detailed design modifications at various sites to facilitate the introduction of longer ‘S’ Stock trains. This involved the re-location of numerous signals, trainstops and track circuit boundaries as well as the use of signalling enforced train speed control.