Network Rail Provision of VISION Signalling Data
ARK were contracted to analyse the Northern Rail Priority Area 1 and record the associated signalling data from Signalling Plans and Control Tables. This data is fed into the VISION software package to model capacity and allow Capacity Planning. Priority Area 1 involved the analysis of approximately 1,300 signals, the data was successfully delivered to a very ambitious programme. Our success in the delivery of Priority Area…
Network Rail Great Western Main Line Re-signalling
ARK were contracted to carry out the signalling design verification of Signalling Location and REB Designs for the Great Western Main Line Re-signalling Project.
Network Rail Wimbledon Platform 10 Tramlink Capacity Enhancement
ARK undertook the production and delivery of; Stage 1 signalling designs to support a temporary alteration to the signalling arrangements in order that the London end of Wimbledon Platform 10 could be decommissioned. Stage 2a signalling designs to support the relocation of signalling equipment and cables from the Tramlink construction site area.